Starting the Project: Preparing the Building Lot
With approvals secured, we began clearing the lot and laying out plans for the home location in mid-November. As the temperature dropped, we took additional measures to safeguard the quality of the foundation. The harsh winter conditions presented various challenges, but through meticulous planning and decades of experience, we successfully addressed potential issues and continued with the home construction throughout the winter months.
Foundation is Dug for Concrete Pouring
The foundation has been dug, and we're getting ready to pour the footers today. We install drainage pipes, stone, and a 10-mil vapor barrier below the concrete floor to manage subsurface water. Tomorrow, we'll pour the foundation walls.
Be sure to check out the views the homeowner will experience every morning from their new home.
Exterior Framing & Sitework
- Exterior Framing: The exterior framing is now complete, and we're gearing up to place the trusses using a crane tomorrow.
- Electrical: The power is being installed on a pole.
- Septic:
The excavator is hard at work on the septic systems before the upcoming snowfall.
It's been a solid project so far, and we truly appreciate the crew's dedication and hard work, especially in these freezing temperatures.
Roof Trusses
Work on-site is advancing steadily, despite challenging winter conditions. Our team continues to push forward, maintaining a strong pace on all fronts.
- Site Work: The excavation crew is actively moving loam onto the site to cover the septic system.
- Structural Progress: A major milestone was reached this morning as the roof trusses were successfully lifted and set into place by crane.
Despite the very cold temperatures, the crew remains dedicated to keeping the schedule on track. With the roof structure now taking shape, we are preparing to transition to the next phase and expect to begin interior framing very soon.
Basement Upgrade
The client decided to add a finished basement to their Scope of Work.
These upgrades to the basement space take it from a storage area to a multi-room space with two bedrooms, a kitchen, a bathroom, and a laundry space.
Sheetrock - Main Floor
Inside work is steadily moving forward. In this tour, we'll walk you through the progress on the main floor, including:
- Living Room: This open area includes a gas fireplace and direct access to the kitchen and dining areas.
- Kitchen: Two islands and dining area with access to patio.
- Bedrooms/Bathrooms: Three bedrooms and bathrooms.
Basement Framing
The framing in the basement living space is finished, and the styrophone barrier has been installed. Insulation will be added soon. The entire space will have a drop ceiling
Egress windows will be added to each of the two bedrooms. This space also includes a small kitchen, bathroom, laundry area, common space, and a "vestibule" for the exterior door.
Have Questions About New Home Construction?
We love talking with homeowners about building their dream home. Our new construction services are comprehensive and offer a 5-year warranty on workmanship.
Give us a call at 207-232-1732 or send us an email at eric@ecopro.construction to schedule a meeting at your location.
About Eco-Pro Construction
Eco-Pro Construction was founded by Eric Hallee, a 30-year veteran in the residential construction space. He brings extensive knowledge, experience, and innovation to every custom home and home renovations project. You can learn more about Eco-Pro Construction on Facebook.